Phones answered 24/7, storm nights includedKenosha, WI 53140
Call (833) 751-2102
(833) 751-2102

What a Kenosha roof quote is built from

No figure appears on this page. The roofer measures the roof and confirms the price on site, and the list below is what the price is built from.

  • Repairs, leaks and full tear-offs
  • Ice dams, lake-effect snow and wind damage
  • Kenosha, Racine and northern Lake County, IL

Get a fast quote

Fastest: call (833) 751-2102. Or send this and we call you back.

2026 price guide

Roofing prices in Kenosha

Quick answer

Kenosha Roofing does not publish roofing prices. The area of the roof, how steep it is, how many layers have to come off, what the decking needs and what the permit requires all change the figure, so the roofer quotes after it has been on the roof.

Two roofs of the same size can cost very different amounts. A low-pitch roof with one layer and sound decking is a straightforward reshingle. A steep roof on a lakeshore house with two layers, soft boards at the eave and a chimney that needs new flashing is a longer job, and the roofer will say so before the work is scheduled.

What changes the quote
FactorWhat it changesAsk on the call
Pitch and accessA steep pitch, a tight lot or a rear roof that needs scaffolding takes more labour and safety set-upHow steep is the roof, and where can the crew park?
Layers and deckingA second layer must usually come off, and soft or damaged decking is replaced before new covering goes onHow many layers are on it now?
Flashing and permitsChimneys, valleys and vents are reflashed separately; some towns require a permit, and the paperwork is part of the jobWhich town, and does a permit apply?

Estimates for Kenosha County in 2026. Your exact price is explained and approved before work starts.

What changes the price

Five things that move your quote

Pitch and size

The roof area and the steepness set the labour and the materials, and steep roofs need more safety equipment.

Decking condition

Soft or rotten boards found under the old covering are repaired before the new covering is laid, and that is confirmed on the roof.

Permit and inspection

A town may require a permit for a tear-off or new decking; a reshingle may need none. The local building department decides.

Want an exact number?

Call, describe the problem, and we will give you a realistic range on the phone, then a firm price on site before any work starts.

WhatsApp